Application Of BIM 5D Methodology In The Construction Of A Children's Park

dc.contributor.authorArroyo Orozco, Jorge Jose
dc.contributor.authorRendon Gonzalez, Domenica Paulette
dc.contributor.authorFlor Chavez, Gino Fernando
dc.contributor.authorGuerrini Cardona, Sabrina Milena
dc.date.accessioned2020-08-17T03:07:59Z
dc.date.accessioned2022-02-22T12:13:01Z
dc.date.available2020-08-17T03:07:59Z
dc.date.available2022-02-22T12:13:01Z
dc.date.issued2020-07
dc.description.abstractThis project is based on the planning and control of the progress of the construction of the Children's Park in the Corozal Precinct, to carry out the planning of this work, the information was provided by the district administration of Isisdro Ayora, and after a thorough review, we proceeded to calculate the quantities of work, the analysis of unit prices which was used to develop the budget of the project. Then the Gantt chart was drawn up using the Ms Project software, which shows us the time it takes to carry out each activity with its cost and resources, after which the valued schedules of the team and staff were made. To use the BIM 5D methodology, the 3D model was made using the Revit 19 software, after obtaining the 3D model, the other two dimensions are integrated by the Navisworks software, in which we integrate the 3D Model with the Gantt Diagram of the Project, obtaining a Model in 5D. Finally, a simulation of the progress of the project is made, which reflects the time and cost of the work.en_US
dc.description.countryEcuadoren
dc.description.institutionUniversidad de Guayaquilen
dc.description.trackProject Management, Service Engineering, Production Engineering and Product Life Managementen
dc.identifier.isbn978-958-52071-4-1
dc.identifier.issn2414-6390
dc.identifier.otherhttp://laccei.org/LACCEI2020-VirtualEdition/meta/FP57.html
dc.identifier.urihttp://dx.doi.org/10.18687/LACCEI2020.1.1.57
dc.identifier.urihttps://axces.info/handle/10.18687/20200101_57
dc.journal.referatopeerReview
dc.language.isoEnglishen_US
dc.publisherLACCEI Inc.en_US
dc.rightsLACCEI License
dc.rights.urihttps://laccei.org/blog/copyright-laccei-papers/
dc.subjectplanningen_US
dc.subjectBIMen_US
dc.subjectconstructionen_US
dc.subjectdesignen_US
dc.subjectengineeringen_US
dc.titleApplication Of BIM 5D Methodology In The Construction Of A Children's Park
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
FP57.pdf
Size:
2.29 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
64 B
Format:
Plain Text
Description: