Process approach and SCOR model to reduce delivery delays for a maintenance equipment supplier for mineral transportation

dc.contributor.authorSalas-Loayza, Fernando
dc.contributor.authorBarboza-Miyoshi, Ricardo
dc.contributor.authorChavez-Soriano, Pedro
dc.contributor.authorRamos, Edgar
dc.contributor.authorSalas-Castro, Rosa
dc.contributor.authorMacassi, Iliana
dc.date.accessioned2021-08-17T03:07:59Z
dc.date.accessioned2022-02-22T12:16:48Z
dc.date.available2021-08-17T03:07:59Z
dc.date.available2022-02-22T12:16:48Z
dc.date.issued2021-07
dc.description.abstractThis document presents the implementation of the SCOR and BPM model in a company that distributes equipment for the mining sector in Peru. Three levels of SCOR are used, the first two to identify the processes of the supply chain and the sub-processes of each of them, in the third level BPM is modeled and used where the processes are analyzed to detect the root cause of late delivery orders, generating the penalty payment. To reduce late orders, the processes and methods are redesigned. For the implementation, SCOR and BPM good practices are used for the development of the procedures, while the control and follow-up is done with the indicators that are also established in the SCOR model, expecting an improvement objective of up to 50% as proposed by other authors, so through simulation of improved processes it is obtained that result of order fulfillment is reduced by 3 weeks, achieving that orders delivered on time improve by 49% reaching objective proposed for this study.en_US
dc.description.countryPeruen
dc.description.institutionUniversidad Peruana de Ciencias Aplicadasen
dc.description.trackEngineering Infrastructure, Construction Engineering, Logistics and Transportation, and Qual. Assur.en
dc.identifier.isbn978-958-52071-8-9
dc.identifier.issn2414-6390
dc.identifier.otherhttp://laccei.org/LACCEI2021-VirtualEdition/meta/FP505.html
dc.identifier.urihttp://dx.doi.org/10.18687/LACCEI2021.1.1.505
dc.identifier.urihttp://axces.info/handle/10.18687/20210101_505
dc.journal.referatopeerReview
dc.language.isoEnglishen_US
dc.publisherLACCEI Inc.en_US
dc.rightsLACCEI License
dc.rights.urihttps://laccei.org/blog/copyright-laccei-papers/
dc.subjectSCORen_US
dc.subjectBPMen_US
dc.subjectorder fulfillmenten_US
dc.subjectprocess redesign mining maintenance supplieren_US
dc.subjectBPMNen_US
dc.titleProcess approach and SCOR model to reduce delivery delays for a maintenance equipment supplier for mineral transportation
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
FP505.pdf
Size:
661.52 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
64 B
Format:
Plain Text
Description: