Browsing 2020 LACCEI - Virtual Edition by Subject "5’s"
Now showing items 1-1 of 1
-
Model of Lean tools for the reduction of waste in the manufacture of non-metallic minerals
(LACCEI Inc., 2020-07)The present paper presents a model that combines tools such as SLP (Systematic Layout Planning), 5´s, Standardization of methods and Preventive Maintenance for the reduction of waste in the manufacture of non-metallic ...